Clean a variety of intricate shapes suspended from a rotating fixture.

Spinner Hangers

  • Blast clean multi-faced or complicated parts.
  • Designed to blast clean a high volume of parts affixed to a rotating tree fixture work hook mounted in the cabinet or suspended from a monorail on a pass through basis to spin parts in front of the blast wheels.
  • By simultaneously spinning and oscillating work hooks in the blast stream, complete coverage of parts is accomplished.

Get a Free Quote

Call MetFin today at 800 537-8966 or simply fill out our online form.
We’ll recommend a MetFin solution that meets your blasting or peening requirements.

Cabinet Style Spinner Hangers

Simple design affords efficient cleaning of small parts. Manual load a stationary hanger which provides all the benefits of blast cleaning without the cost of an automated system.

Turnstile Spinner Hangers

Increase your blast cleaning productivity with a highly efficient turnstile spinner hanger. A large rotating drum, divided into two or more blast chambers with work hooks, allows for loading at one station while another is being blasted. When blast cleaning is complete, the entire drum rotates, moving the next loaded section into the blast chamber and the newly blasted section out for unloading. Turnstile spinner hangers are adaptable to multiple blast compartments and up to six blast wheels.

Monorail Spinner Hanger Cabinets

A monorail moves large or heavy parts into and out of the blast chamber. Parts are loaded outside the blast cabinet on a work hook and moved into the blast chamber to be cleaned. After the cleaning cycle, the work hooks move out of the cabinet to be unloaded. Monorail systems allow multiple work hooks for loading/unloading while another is being blasted, providing a high production, near continuous blasting process.

Continuous Monorail Spinner Hangers

Monorail loop systems provide a non-stop, high production, blast cleaning process. Parts are loaded on the monorail at one station, proceed through the blast chamber and out for unloading while the monorail continues to move. The blast chamber is utilized at maximum capacity for high volume environments. Multiple operators are required to handle the large quantity of parts processed.